THE HYDROPOWER POTENTIAL AND FEASIBILITY ANALYSIS OF SOMBRIERO RIVER, RIVERS STATE, NIGERIA
DOI:
https://doi.org/10.4314/njt.372.1675Keywords:
River discharge rate, hydro power potential, Financial viabilityAbstract
This paper examines the Sombriero River with a view of ascertain its discharge rate, potential hydro power can be derived and to provide a RETScreen-based financial viability analysis of adopting the river for a Micro Hydro Power Scheme. The river discharge was measured via the “Float Method Technique” while the river surface and mean velocities, derivable power as well as the scheme’s viability were computed. The Sombriero river has the capacity to deliver 51kW power, it would be a viable venture at a tariff price of 127.61$/MWh and would be most suitable for Run-Off-River hydro scheme considering that it has low water head and substantial discharge.
Downloads
Published
Issue
Section
License
The contents of the articles are the sole opinion of the author(s) and not of NIJOTECH.
NIJOTECH allows open access for distribution of the published articles in any media so long as whole (not part) of articles are distributed.
A copyright and statement of originality documents will need to be filled out clearly and signed prior to publication of an accepted article. The Copyright form can be downloaded from http://nijotech.com/downloads/COPYRIGHT%20FORM.pdf while the Statement of Originality is in http://nijotech.com/downloads/Statement%20of%20Originality.pdf
For articles that were developed from funded research, a clear acknowledgement of such support should be mentioned in the article with relevant references. Authors are expected to provide complete information on the sponsorship and intellectual property rights of the article together with all exceptions.
It is forbidden to publish the same research report in more than one journal.