[1]
2023. MODELLING REWORK COST FOR TETFUND BUILDING CONSTRUCTION PROJECTS IN NIGERIA. Nigerian Journal of Technology. 42, 1 (May 2023), 72–82. DOI:https://doi.org/10.4314/njt.v42i1.9.