[1]
2015. DETERMINATION OF HEAD FOR SMALL HYDROPOWER DEVELOPMENT: A CASE STUDY OF RIVER ETHIOPE AT UMUTU. Nigerian Journal of Technology. 35, 1 (Dec. 2015), 190–195. DOI:https://doi.org/10.4314/njt.351.1065.