[1]
2016. OPTIMIZATION DESIGN OF GROUND GRID MESH OF 132/33KV SUBSTATION USING ETAP. Nigerian Journal of Technology. 35, 4 (Oct. 2016), 926–934. DOI:https://doi.org/10.4314/njt.354.1188.