(1)
PREDICTING SUITABLE FIELD WORKDAYS FOR SOIL TILLAGE IN NORTH CENTRAL NIGERIA. NIJOTECH 2008, 26 (1), 81-90. https://doi.org/10.4314/njt.261.83.