(1)
AN INVESTIGATION OF TIME-COST-RISK TRADE-OFF IN THE INSTALLATION OF X-RAY MACHINE USING RESPONSE SURFACE METHODOLOGY. NIJOTECH 2014, 33 (4), 482-489. https://doi.org/10.4314/njt.334.848.