(1)
ELECTRICAL LOAD SURVEY AND FORECAST FOR A DECENTRALIZED HYBRID POWER SYSTEM AT ELEBU, KWARA STATE, NIGERIA. NIJOTECH 2015, 34 (3), 591-598. https://doi.org/10.4314/njt.343.980.