(1)
DETERMINATION OF HEAD FOR SMALL HYDROPOWER DEVELOPMENT: A CASE STUDY OF RIVER ETHIOPE AT UMUTU. NIJOTECH 2015, 35 (1), 190-195. https://doi.org/10.4314/njt.351.1065.