(1)
ANALYSIS OF THE TRANSIENT STABILITY LIMIT OF NIGERIA’S 330kV TRANSMISSION SUB-NETWORK. NIJOTECH 2016, 36 (1), 213-226. https://doi.org/10.4314/njt.361.1231.