1.
AN INVESTIGATION OF TIME-COST-RISK TRADE-OFF IN THE INSTALLATION OF X-RAY MACHINE USING RESPONSE SURFACE METHODOLOGY. NIJOTECH. 2014;33(4):482-489. doi:10.4314/njt.334.848