ELECTRICAL LOAD SURVEY AND FORECAST FOR A DECENTRALIZED HYBRID POWER SYSTEM AT ELEBU, KWARA STATE, NIGERIA. (2015). Nigerian Journal of Technology, 34(3), 591-598. https://doi.org/10.4314/njt.343.980