“DETERMINATION OF HEAD FOR SMALL HYDROPOWER DEVELOPMENT: A CASE STUDY OF RIVER ETHIOPE AT UMUTU”. 2015. Nigerian Journal of Technology 35 (1): 190-95. https://doi.org/10.4314/njt.351.1065.