[1]
“ELECTRICAL LOAD SURVEY AND FORECAST FOR A DECENTRALIZED HYBRID POWER SYSTEM AT ELEBU, KWARA STATE, NIGERIA”, NIJOTECH, vol. 34, no. 3, pp. 591–598, Jun. 2015, doi: 10.4314/njt.343.980.