[1]
“PARTIAL REPLACEMENT OF CEMENT WITH BAGASSE ASH IN HOT MIX ASPHALT”, NIJOTECH, vol. 34, no. 4, pp. 699–704, Sep. 2015, doi: 10.4314/njt.344.998.