[1]
“DETERMINATION OF HEAD FOR SMALL HYDROPOWER DEVELOPMENT: A CASE STUDY OF RIVER ETHIOPE AT UMUTU”, NIJOTECH, vol. 35, no. 1, pp. 190–195, Dec. 2015, doi: 10.4314/njt.351.1065.