[1]
“ANALYSIS OF THE TRANSIENT STABILITY LIMIT OF NIGERIA’S 330kV TRANSMISSION SUB-NETWORK”, NIJOTECH, vol. 36, no. 1, pp. 213–226, Dec. 2016, doi: 10.4314/njt.361.1231.