[1]
“RISK-BASED SECURITY ASSESSMENT OF POWER SYSTEM VOLTAGE DROP: A CASE STUDY OF NIGERIAN 330KV 41-BUS TRANSMISSION GRID”, NIJOTECH, vol. 37, no. 3, pp. 735–741, Jul. 2018, doi: 10.4314/njt.373.1781.