“DETERMINATION OF HEAD FOR SMALL HYDROPOWER DEVELOPMENT: A CASE STUDY OF RIVER ETHIOPE AT UMUTU”. Nigerian Journal of Technology, vol. 35, no. 1, Dec. 2015, pp. 190-5, https://doi.org/10.4314/njt.351.1065.