“DETERMINATION OF HEAD FOR SMALL HYDROPOWER DEVELOPMENT: A CASE STUDY OF RIVER ETHIOPE AT UMUTU”. Nigerian Journal of Technology 35, no. 1 (December 31, 2015): 190–195. Accessed April 16, 2026. https://nijotech.com/index.php/nijotech/article/view/1065.