“ANALYSIS OF THE TRANSIENT STABILITY LIMIT OF NIGERIA’S 330kV TRANSMISSION SUB-NETWORK”. Nigerian Journal of Technology 36, no. 1 (December 31, 2016): 213–226. Accessed April 16, 2026. https://nijotech.com/index.php/nijotech/article/view/1231.